Installing new flooring over existing hardwood is a practical way to refresh a room without the mess and labor of tearing out the old planks. It works best when the existing hardwood is in decent shape—flat, secure, and free of major damage. This guide covers the general process for floating floors (like laminate or engineered wood) and glue-down options, which are the most common choices for going over hardwood. Before you start, check that the hardwood has no loose boards, no squeaks, and no signs of moisture. Also confirm that the subfloor beneath is solid, because any movement will transfer to the new floor.
What You’ll Need
- New flooring material (laminate, engineered wood, or vinyl planks)
- Underlayment (if required by the flooring manufacturer)
- Moisture barrier (for basements or concrete subfloors below the hardwood)
- Measuring tape and pencil
- Utility knife and straightedge
- Circular saw or flooring cutter (for cutting planks)
- Spacers (to maintain expansion gaps at walls)
- Rubber mallet and tapping block (for locking planks)
- Pull bar (for tight spots near walls)
- Safety glasses and dust mask
- Knee pads (optional but helpful)
Step-by-Step
- Inspect and prepare the existing hardwood. Walk the room and note any loose, squeaky, or visibly damaged boards. Nail down any loose boards using finishing nails, and sand down any high spots or protruding nails. Fill large gaps or holes with wood filler and let it dry. The surface must be flat: use a level and a long straightedge to check for dips or humps. If you find low spots, level them with a self-leveling compound designed for wood subfloors.
- Remove baseboards and trim. Use a pry bar to carefully remove baseboards and quarter-round molding. This gives you room to install the new floor and allows for the required expansion gap. If you plan to reuse the trim, label each piece. If not, set them aside for disposal.
- Check the moisture level. Hardwood can absorb moisture, so test it with a moisture meter. The reading should be within the range recommended by the new flooring manufacturer. If the hardwood is in a basement or over a crawlspace, lay a polyethylene moisture barrier over the entire floor, overlapping seams by several inches and taping them.
- Acclimate the new flooring. Bring the boxes of new flooring into the room and let them sit for the time specified by the manufacturer—usually a couple of days. This lets the material adjust to the room’s temperature and humidity, reducing the risk of gaps or buckling later.
- Install underlayment (if needed). Roll out the underlayment across the room, perpendicular to the direction you plan to lay the planks. Trim it with a utility knife and tape the seams. Some floating floors have underlayment attached, so check your product. For glue-down floors, skip this step.
- Plan the layout. Measure the room’s width and divide it by the plank width to see how much will be left for the last row. If the last row would be narrower than a few inches, adjust the starting row so both edges are balanced. Also decide the direction: planks usually run parallel to the longest wall or the main light source.
- Lay the first row. Place spacers against the wall, about a half-inch apart, to create the expansion gap. Lay the first plank with the tongue side facing the wall (or as the manufacturer directs). Continue placing planks end-to-end, locking the short ends together. Use a tapping block and rubber mallet to snug the joints without damaging the edges.
- Continue across the room. For each subsequent row, stagger the end joints—typically by at least a foot or a third of the plank length. Lock the long edges by angling the plank into the previous row and pressing down. Work in a brick pattern, keeping rows straight and tight. Cut planks as needed using a saw, and use a pull bar near walls to lock the last planks in each row.
- Handle obstacles. For doorways, undercut the door frame with a handsaw so the plank slides underneath. For vents or pipes, measure and cut the plank to fit around them, leaving a small gap. Use a jigsaw for curved cuts.
- Install the final row. Measure the remaining space, subtract the expansion gap, and rip the planks to width. Lock them in place using the pull bar. Remove all spacers once the floor is fully installed.
- Reinstall trim. Nail the baseboards and quarter-round back into place, covering the expansion gap. Do not nail through the new flooring—attach the trim to the wall only.
Common Mistakes
- Skipping the moisture check—if the hardwood is damp, the new floor will warp or grow mold.
- Not leaving an expansion gap at the walls, which causes the floor to buckle when it expands.
- Forgetting to stagger the end joints, leading to weak spots and an unattractive pattern.
- Nailing trim through the new floor, which can damage planks and restrict movement.
- Ignoring high or low spots in the old hardwood—these will telegraph through the new floor.
Tips
- Work from several open boxes at once to mix planks from different batches, so color variations blend naturally.
- Keep a few extra planks after the job for future repairs—they may be hard to match later.
- Use a sharp blade in your utility knife for cutting underlayment and vinyl; it makes cleaner cuts.
- If the room is very large, install a transition strip at doorways to allow for expansion breaks.
- Wear socks or soft-soled shoes while working to avoid scratching the new surface.
Troubleshooting
- Planks won’t lock together: Check that the groove is free of debris and that you’re using the correct angle. Tap gently with the block, working from the center outward.
- Gaps appear between planks: This often happens if the rows aren’t straight. Pull the row apart and restart, ensuring the first row is perfectly square to the wall.
- Floor feels springy or moves: The existing hardwood may have a soft spot. Nail down the old boards, or add a layer of underlayment to smooth it out.
- Buckling after installation: Remove the baseboards and check that the expansion gap is clear. If it’s filled with debris or the floor is pinned by a doorway, the floor needs room to expand.
- Mold or musty smell: This indicates moisture. Stop work, find the source (leak or high humidity), and fix it before proceeding. You may need to remove the new floor and address the hardwood.
Frequently Asked Questions
- Can I install tile over hardwood? Yes, but it’s risky. Tile needs a rigid, perfectly flat base, and hardwood expands and contracts, which can crack tile. A cement backer board is usually required, adding height. Many professionals recommend removing the hardwood first.
- Do I need to remove the hardwood if it’s in good shape? No. As long as it’s flat, dry, and secure, you can install over it. This saves time and money and avoids the mess of demolition.
- Will the new floor raise the height too much? It depends on the thickness of the new flooring and underlayment. Check door clearances and transitions to adjacent rooms. You may need to trim doors or use a transition strip.
- Can I install carpet over hardwood? Yes, but it’s not reversible without damaging the hardwood. Carpet padding and tack strips can leave marks. If you might want the hardwood later, consider a floating floor instead.
- How do I handle a squeaky hardwood floor before installing over it? Squeaks come from loose boards rubbing against nails or subfloor. Drive screws through the hardwood into the subfloor, countersink them, and fill the holes. This will quiet the floor before you cover it.
- Is it better to glue or float the new floor? Floating is easier for DIY and allows the floor to expand and contract independently. Glue-down gives a more solid feel but is harder to remove. Follow the manufacturer’s recommendation for your subfloor type.
How to Install Flooring Over Existing Hardwood